Challenge
Change out of gas lift valves (GLV) due to valve failures or non-optimum gas lift design can be costly, especially in offshore and subsea environments.
Interruption of, or non-optimum gas lifted production has a negative impact on field economics. Furthermore, leaking GLV’s often lead to downgrading of the wells integrity level.
Solution
Petroleum Technology Company´s (PTC) SafeLift® valves have a proprietary orifice and back-check system, which eliminates chatter and wear. This design has proven to have unsurpassed longevity and reliability, which reduces intervention costs.